New Contract Awards

 

Pacific Gas & Electric Company (PG&E)

PGE-727333

The team of Auriga Corporation & Burns & McDonnel have been awarded a contract to provide NERC Mitigation Services for the transmission system by PG&E. Auriga is a subcontractor to Burns and McDonnell for the PG&E MSA Contract for Transmission and Substation Design and Engineering Services.

 

Metropolitan Transportation Commission (MTC)

MTC

Auriga has been awarded a contract by Metropolitan Transportation Commission to provide Professional Services for the Clipper Program for the next 3 years (2013-2016)

 

Bay Area Rapid Transit District (BART)

bart-logo-large

As a subcontractor to Anil Verma Associates (AVA) on the BART GEC Contract, Auriga Corporation is currently providing Design and Engineering Services for Traction Power to the Bay Area Rapid Transit District. Auriga performs Transient Stability Analysis for Transformers, Blocking Scheme Project, Installation of New Traction Power Substations and Transfer Trip Design for BART Traction Power Substations.

 

Metropolitan Transportation Commission (MTC)

MTC

Auriga was awarded a contract to conduct Database Management Service for Clipper Asset Performance and Maintenance Monitoring to MTC. Auriga provides engineering and IT support on this important project to develop, store and manipulate maintenance reporting data supplied.

 

Santa Clara Valley Transportation Authority (VTA)

Santa Clara Valley Transportation Authority

Auriga was awarded a contract for SQL 2008/SharePoint Consulting Services for Automated Live Train Tracking System for VTA.

 

El Dorado Irrigation District (EID)

Eldorado

Auriga has been awarded an On-Call Professional Services Contract for Information Technology Services and AutoCAD Drafting Services for El Dorado Irrigation District. The project duration is for 2 years (January 2014 – December 2016).