Toggle navigation
Home
Services
Project Management
Construction Management
Electrical Engineering
Fare and Payment Systems
Information Technology
Systems Engineering
Projects
Transit
Utilities
State and Local
International
About Us
Our Team
Certifications
Publications
Brochures
Careers
Auriga Offices
Contact
Search for:
Projects
All
Transit
Utilities
State and Local
International
Backbone Fiber Optic Network Feasibility
Transmission Line Feasibility
Integrated Smart Grid Project
Engineering Services
NERC Cyber Security, Compliance
Transformer Design Specification Review
Digital Fault Recorder Modifications – Lake Substation
Pearl Harbor Scada System Upgrade Project
BART’s Silicon Valley Berryessa Extension (SVBX) Project: Phase I – Positive Train Control Testing
Automatic Train Control System Engineering Support Services
Microwave System Upgrade Implementation Plan and Final Network Diagram
Development of a Data Architecture Strategy for The State Of California
Information Technology (IT) Service Bench
Information Technology (IT) Service Bench
Automated Train Tracking System (ATTS)
Develop Design Criteria for Automatic Fare Collection (AFC)
TransLink® (Clipper®) Project Management, Engineering and Integration
Comprehensive Technical Specification For Cta’s Farebox Cash Collection System
Design Change Notice (DCN) for Upgrade Relay Protection for Transformer
Distribution Engineering Services
Cast Coil Transformer Replacement Project at 12 Traction Power Substations
Construction Management Services, Pleasanton, CA
Central Subway Project
SFMTA’s Twin Peaks Tunnel Trackway Improvement Project – Cost and Schedule
Database Management Service for Clipper® Asset Performance and Maintenance Monitoring
SFMTA’s Radio System Replacement Project
Year Established
0
Contracts Awarded
0
Personnel Appointed
0
Countries Served
0
Contact
Full Name*
Email*
Company Name*
Phone Number*
Message
Receive updates covering engineering, construction, technology and all things we do.
Submit